These do not look like much but it took a full weekend to re-plumb and fix the PVC for the vent and drain.
As we removed the end of the PVC to reroute it we noticed the top was cracked and needed to be replaced. As we cut it the pipe fell about a foot through the attic, gust room and into the mudroom. More time delays.
This is the new and old PVC rejoined
about 3 feet from original location.

Also the pipe square is also moved about 3 feet. We added a
white box that holds the hot and cold and the water drain. It took about 2 hours to get
this to work. We tried the push on fittings and a screw top but it leaked every time. Mike ended up welding it into place. It came out great. I am doing laundry as I blog and no leaks! Yippee. Great job Mike. He saved us a bundle of money.

So we could move the washer and dryer back into the previous closet from the yellow room.

The
HVAC guy came and finished the heating adjustments. We have to do electric and and we will be ready for the inspector to come.